Shut Posted on Notes
Zeit on-line didn’t edit this message edited. The German Press (DPA) Company mechanically took over.
Vacationers on occasion needed to spend a large number of persistence (symbol archive). © Sven Hoppe / DPA / DPA-TMN
After a sign dysfunction on the Central Station in Munich, site visitors is restarted. Phase-Freising-Land Close and Munich within the path of Geltendorf / Buchloe, as a spokeswoman for Deutsche Bahn (DB). Now all of the upkeep are finished, it’s mentioned past due within the night time. Restrictions will have to not be anticipated.
Flow
Energy failure: Maximum families in Spain and Portugal are on-line once more Blackout: Failure to offer Spain and Portugal Lahm – nuclear energy vegetation in emergency paintings Z + (sacrificed content material); Blacking in Spain: An afternoon like the top of the top
Most effective in April has had issues of indicators after he clearly intentionally offered the cable hearth in Munich, huge issues within the Bavarian Railway Community. The Nuremberg-Erfurt’s icy path. On account of the mess, indicators jumped on pink and trains may not input sure portions of the path.
Every week in the past, the wear to the overhead line close to Ingolstadt paralyzed crucial connection to the north-south between Nuremberg and Munich about ten hours.
© DPA-InfoCom, DPA: 250521-930-574622 / 3