The fireplace field with fuse sign packing containers within the Hanover area has ended in robust issues in railway site visitors between Hanover and Berlin. The fireplace broke out on Saturday night time, the reason was once unclear to this point. The Federal Police checked whether or not the technical impairment or fireplace was once accountable.
In keeping with Deutsche Bahn, there have been a lot of omissions and delays in long-lasting delivery. Ice and IC trains have been redirected and thus not on time considerably, every now and then greater than an hour. A lot of trains have additionally failed in native delivery.
In keeping with the railway, Ice and IC trains on Hannover-Wolfsburg-Berlin have been as much as 70 mins. The IC connections between Hanover and Magdeburg was once anticipated to be 25 mins past due. Some trains needed to be utterly coloured.
There have been additionally vital restrictions in native delivery. Many connections failed, every now and then a alternative of the rail is ready. In keeping with the Federal Police, the broken fuse field is set two kilometers from the true sign field.
Up to now, it has now not been predictable to how lengthy the paintings goes to be repaired. The dysfunction additionally impacts a adventure round any other Department of Hanover 96. in opposition to Herth BSC within the night, which can be anticipated to be anticipated by way of the visitors from Berlin.
Deutsche Bahn
Extra about this matter
Z + (precision content material); Deutsche Bahn: Why do not sockets paintings within the teach? Z + (precision content material); Vincent Ducrot: “In Switzerland, we are not developing a train against each other” Z + (sacrificed content material); Deutsche Bahn: Is the ice trip truly turn into so impolite?