23. Might 2025, 11:12 P.M. Supply: DPA North Rhine-Westphalia
Realize
Zeit on-line didn’t edit this message edited. The German Press (DPA) Company robotically took over.
The driving force separated a pantograph from the motive force’s cord and avoided the passengers to go out. (Symbol Archive) © Hauke-Christian Dittrich / DPA
The torn cord above the principle line hit the railway site visitors round the principle educate station in Monchengladbach and introduced a big hearth brigade surgical operation and educate. The cord fell at the regional specific specific close to the educate station within the afternoon. 133 Vacationers then needed to be evacuated from the educate, no person used to be injured.
Circulation
Alternate of time: harm and closure of the railway after robust storms Z + (sacrificed content material); Blackout in Spain: Deutsche Bahn Devent Day: Trains from Hamburg and Dortmund in Switzerland will now lead to Basel
Consistent with the hearth brigade, the engine motive force reacted, as an example, right away separated the facility buyer from the motive force’s cord and avoided the passengers, since the trains nonetheless tired on adjoining numbers and electrical energy from the torn line used to be an acute threat.
The railway stopped all travels within the hit phase of the path and grew to become off the facility. At the moment, the executive of the Emergency Railway Referred to as the broken overhead line ahead of the hearth brigade and the Federal Police with a typical evacuation of the educate. Passengers left the educate over the ladder and adopted the tracks at the platform.
© DPA-InfoCom, DPA: 250523-930-584983 / 1