After the fireplace field with fuse within the sign box within the Hanover area, the teach speaks of “vandalism” as a purpose. The fireplace recently reasons severe harm in railway site visitors between Hanover and Berlin. The railway introduced that because of “vandalism damage” on the week between Hanover and Berlin, delays and cancellations of coaching.
Circulation
Railway site visitors: The logo supplies harm within the Hannover-Berlin energy failure: about 20,000 families in Berlin continues with out electrical energy Deutsche Bahn: nearly each and every longer lengthy distance teach in July
Police, then again, mentioned, on request that there aren’t any new findings referring to the reason for the fireplace. It’s recently being tested whether or not the technical harm or fireplace used to be the reason for the fireplace. Investigators would dismantle the software and took it with them. So as of investigations, the police don’t seem to be best anticipated within the coming days.
Delays and screw ups – Period of repairing paintings vaguely
Consistent with Deutsche Bahn in long-term delivery between Hanover and Berlin, the dysfunction ends up in many delays and failure. The median and IC trains Hanover-Wolfsburg-Berlin connections have been redirected and behind schedule as much as 70 mins. With IC trains between Hanover and Magdeburg, the teach expects a disposal of about 25 mins. Because of this person trains are totally annulled.
Consistent with the Federal Police, there also are many omissions and delays of teach and lengthen in native delivery. From time to time site visitors alternative is about. Thus far, it’s unclear how lengthy the paintings of restore will take.
© DPA-InfoCom, DPA: 250913-930-34735 / 1