After the fireplace at the sign field, railway passengers between Hanover and Berlin should be expecting delays and screw ups till Monday afternoon. Ice and IC trains in opposition to Berlin have been redirected and thus not on time about 25 mins, because the teach introduced on Sunday.
Movement
Railway visitors: Mark supplies harm in Hanover-Berlin Z + (Sufferers Content material); Deutsche Bahn: Is the ice experience in reality turn out to be so impolite? Cars: Bahn will take extra incessantly from Berlin and Leipzig to Poland someday
Trains from Berlin in opposition to Hanover most commonly power as same old, however they come with a mild disposal. There are person connections in each instructions. IC trains between Hanover and Magdeburg also are redirected and not on time in about 25 mins, because the teach persisted. By way of when the railway visitors is hit, in line with a spokesman, it was once nonetheless unclear on Monday night time.
Within the weekends, passengers needed to rely delays and screw ups at the essential path. The sign field field field in Lehrte close to Hanover was once burned on Saturday. Because of this, railway visitors was once hard-hit.
The take a look at effects are anticipated right through the day
The teach spoke about vandalism. In step with the police, the reason for the fireplace remains to be no longer transparent. The prison carrier carrier equipped strains and dismantled the protection framework, the police spokesman stated. The result of investigations are anticipated right through the day.
As well as, there was once an coincidence in Hanover-Kleefeld within the past due Saturday night time. The nineteenth 12 months motive force under the influence of alcohol under the influence of alcohol with concrete Bolard along with his automobile that was once thrown at the ice path. The broken line is broken, totally occupied LED needed to prevent at about 900 passengers. Alternatively, the incident had little affect on long-lasting shipping.
© DPA-InfoCom, DPA: 250914-930-38453 / 1